Projects

Projects

Our Work

At Bravus Group, we our proud to showcase a diverse portfolio of projects that can highlight the expertise with rope access. Our innovative use of drones and robotic technology has enabled us to enhance our inspection capabilities and efficiency. 

 

 

Porsche Design Tower at Sunny Isles Beach - 2023 season

  • Painting
  • Caulking
  • Inspection
  • Glass Polishing
  • Window Cleaning
  • Pressure Washing
  • Drone Inspections

Ritz-Carlton Building at Sunny Isles Beach

  • Post-Construction
  • Window Cleaning

W Hotel at Fort Lauderdale

  • Exterior Painting
  • Stucco Repair
  • Caulking

AutoNation Building at Fort Lauderdale

  • Painting

Bank of America at Brickell

  • Caulking
  • Stucco Repair
  • Painting

The Plaza at Coral Gables

  • Fascia Painting
  • Caulking

SoFi Stadium, Inglewood, CA

  • Rigging
  • LED Installation
  • Oil Diaper

Adventure of the Seas, Royal Caribbean at Miami and Galvestone Ports

  • Rigging

Inter Miami Drive Pink Stadium at Fort Lauderdale

  • Rigging
  • Speaker Installation

City Kids Speaks on Liberty Art at Miami Beach

  • Art Banner Installation and Remove

Monaco Yacht Club & Residences at Miami Beach

  • Exterior Painting
  • Caulking
  • Patching

Guardians of the Galaxy Roller Coaster at Disney Epcot Center

  • Alarm Inspection

Acqualina Building at Sunny Isles Beach

  • Post-Construction Window Cleaning

Yatch Club Residence at Brickell

  • Waterproofing
  • Stucco Repair
  • Painting
  • Caulking

Four Seasons at Brickell

  • Caulking

Holiday Inn I-95 Miami

  • Caulking

Sugar Rooftop at Brickell

  • Exterior painting

Luma World Center Downtown

  • Exterior Painting
  • Caulking
  • Patching

HSBC Parking Lot at Brickell

  • Stucco Repair

Kiewit Terminal at Corpus Christi

  • Rigging
  • Hoisting

FIU (Florida International University) at Miami

  • Painting

HSBC Parking Lot at Brickell

  • Stucco Repair

Wind Services North Dakota

  • Wind Services
  • Robot Inspection

Tampa Project

  • Sidding 

FIU Doral

  • Post-construction Cleaning

Pier 66 Marina Fort Lauderdale

  • Welding at Heights
  • Rigging 

Casa Neos Miami River

  • Caulking
  • Painting
  • Waterproofing 

Hard Rock Stadium for F1

  • Speakers Cleaning

Wind Services Iowa

  • BAT installation 

Pier 66 Building

  • Painting
  • Caulking


Fontainebleau Convention Center

  • Post-construction window cleaning

Miami Overtown - Residences at Sawyer´s Walk

  • Painting
  • Caulking

Porsche Design Tower - 2024 season

  • Painting
  • Caulking
  • Stucco Repair
  • Glass Polishing
  • Pressure Washing
  • Inspection
Scroll to Top